EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (679)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
-
Fogged cylinders and...
-
Silicone Baffling
-
Baffling and Paint Prep
-
Baffling
-
Baffling
-
Baffling ans wiring
-
Baffle seals
-
Baffle Seals
-
Baffle seals
-
Baffles
-
Engine Baffle Seals
-
Baffling
-
Wiring
-
Wiring
-
EGT Probes, Ignition...
-
Exhaust
-
Exhaust and securing...
-
Baffles
-
Air Box
-
Engine
-
Baffling and Oil Dip...
-
Cowling
-
Oil door and cowling...
-
Oil Access Door
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Throttle and Mixture...
-
Throttle Cable
-
Baffles and windshield
-
Engine wiring
-
Prop flange and...
-
Coanda Fairing and...
-
Ignition wiring
-
EGT Probes and Airbox
-
CHT Probes and...
-
Airbox
-
Airbox
-
Airbox and Baffling
-
Baffling
-
Baffling
-
Front baffling
-
Baffles
-
Baffles
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Fuel and pressure lines
-
Wiring
-
Wiring
-
Wiring
-
Engine accessories
-
Engine Accessories
-
Starter ring gear...
-
Engine accessories
-
Engine accessories
-
Engine Install
-
LSE Ignition
-
Engine Buildup
-
Engine Accessories
-
Engine Accessories
-
Engine prep
-
Engine Accessories
-
Firewall wiring
-
Wiring
-
Firewall Accessories
-
ANL Fuse
-
Pressure Manifold
-
Wiring
-
Cabin Heat Box and...
-
Engine controls and...
-
Engine Delivery Day
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
-
Paint and skylight
-
Covers and Fairings
-
Wing Struts
-
Move fuselage
-
Fuselage
-
Wingtip prep
-
Fuselage
-
Fuselage
-
Masking
-
Repaint
-
Fuselage
-
Fuselage
-
Carbon Fiber prep
-
Fuselage prep
-
Fuselage
-
Windshield molding...
-
Fuselage Prep
-
Fuselage
-
Fuselage prep
-
Fuselage prep
-
Fuselage prep
-
Moved wing
-
Fuselage prep
-
Right Wing Paint
-
Fuselage Prep
-
Silver Trim
-
Prep Right wing
-
Masking
-
Right Wing
-
Post painting
-
Paint prep
-
Prep for painting
-
Paint prep
-
Prime and paint
-
Fuselage
-
Wing
-
Masking
-
Prep Right Wing
-
Silver Trim
-
Masking
-
Masking
-
Black trim
-
Masking
-
Paint left wing.
-
Scuff sanding
-
Prep for Paint
-
Left Wing prep
-
Wing Prep
-
Wing rotator
-
Wong prep
-
Wing rotator
-
Horizontal Stab
-
Final Trim color
-
Sanding and masking
-
Masking
-
Vertical Stab
-
Rudder
-
Horizontal Stab
-
Paint and scuff sanding
-
Paint instruction
-
Paint booth...
-
Sanding
-
Scuff sanding
-
Horizontal Stab
-
Horizontal Stab
-
Horizontal...
-
Sanding
-
Paint booth setup
-
Elevator
-
Interior Panels
-
Interior
-
Vertical Stab and...
-
Horizontal Stab
-
Horizontal stab
-
Painting ailerons...
-
Priming
-
Masking
-
White paint
-
Priming
-
Priming
-
Cleaning parts
-
Prep
-
Prep for paint
-
Wing root ribs
-
Paint Prep
-
Baggage Compartment
-
Painting baggage...
-
Preparing Baggage...
-
Prep for priming...
-
Fuselage rotator
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (52)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1991
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jul 15, 2023
Baffle Seals
- (2 hours)
Category: Engine
Finished installed baffle seals. Still need final fit of cowling to determine where they need to be trimmed and sealed with RTV.
20230715_123426.jpg
20230715_123504.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.